OdomVE designs, submits, and manages your SDP through every review cycle and every reviewing agency so your project keeps moving.

Complete application package prepared for a clean completeness check, including the engineer's summary letter signed and sealed by a Texas PE.
Limits of construction, setbacks, easements, and impervious cover documented the way City of Austin reviewers expect to see them.
Grading plans, stormwater detention, and water quality controls inside your SDP that satisfy the Drainage Criteria Manual and Atlas 14.
Water, wastewater, and dry utility layout within the permit set, coordinated with Austin Water and the reviewing departments.
Temporary controls and environmental compliance sheets required for SDP approval and construction release.
We manage every Master Comment Report item round by round until your site development permit is approved.
Every project gets principal level attention from a licensed Texas PE. There are no handoffs to junior staff and no loss of context between design and permitting.
Value engineering is our core methodology. Every design decision is weighed for cost, schedule, and approval risk so your project moves forward without wasted spending.
OdomVE works directly with every reviewing agency on your permit, so plans are prepared the way each reviewer expects to see them.
Your site does not care about city limits, and neither do we. OdomVE manages site development permits through every authority having jurisdiction over your project, whether that is one agency or five reviewing at the same time. Many Central Texas sites fall in an ETJ or trigger overlapping state and county review, and knowing who has auth
Your site does not care about city limits, and neither do we. OdomVE manages site development permits through every authority having jurisdiction over your project, whether that is one agency or five reviewing at the same time. Many Central Texas sites fall in an ETJ or trigger overlapping state and county review, and knowing who has authority before design begins is often the difference between a 4 month approval and a 12 month one.
Full SDP review through Development Services, including DAC submittal, Austin Water, Watershed Protection, and Transportation Development Services.
County site development and commercial permits for projects outside corporate city limits, including floodplain and drainage compliance.
Site development permitting in Georgetown, Round Rock, Bastrop, Pflugerville, Leander, and other Central Texas jurisdictions, including projects split between city and ETJ authority.
Driveway and access permits, right of way coordination, and roadway improvements where your site fronts a state highway.
State environmental compliance tied to your site development, including water, wastewater, and Edwards Aquifer requirements where applicable.
Coordination with fire marshals, MUDs, and water and wastewater providers whose sign off your permit requires.
One engineer accountable for every agency touching your permit.
We review the site against the Land Development Code and utility capacity before design begins, so we know the real approval path from day one.
We prepare grading, drainage, utility, and site plan documents built to match the specific checklist of the reviewing agency.
We submit through DAC and coordinate directly with City, County, and utility reviewers to keep your case moving on their desk.
We manage reviewer comments round by round and keep the project moving so it never stalls until you have an approved permit in hand.
Please reach us at Landon@OdomVE.com if you cannot find an answer to your question. Not sure you need a full site development permit? Smaller projects may qualify for a site plan exemption or Site Plan Lite.
Most new construction, additions, and changes of use in Austin require some level of site plan review, even small commercial buildouts. A licensed engineer can confirm your exact requirement within a day or two of reviewing your address and scope.
A full site development permit in Austin typically takes 4 to 6 months across multiple comment rounds, depending on project complexity and reviewer workload. Well prepared plans that anticipate reviewer comments consistently move faster than the citywide average.
Most full site development permits in Austin run from roughly $15,000 to $40,000 or more in engineering fees depending on grading, drainage, and utility complexity. We provide a fixed fee proposal after reviewing your address and project concept, so there are no hourly surprises.
Yes. We manage site development permits through Travis County, Williamson County, Georgetown, Round Rock, Bastrop, and other Central Texas jurisdictions, including ETJ projects where city and county authority overlap. We also handle the TxDOT and TCEQ coordination those sites frequently require.
Projects that exceed the City's thresholds for site disturbance, impervious cover, or change of use require a full site development permit rather than an expedited path. We confirm your exact requirement within a day or two of reviewing your address and scope, before you spend anything on design.
Nearly every SDP receives comments, and stacked review cycles are where projects lose months. We respond to Master Comment Report items quickly and coordinate directly with each reviewing department so comments get resolved instead of repeated.
An AHJ is the authority having jurisdiction, meaning the agency or agencies with legal review authority over your site. A single project can answer to a city, a county, TxDOT, TCEQ, and a fire marshal all at once. Identifying every AHJ on day one keeps a surprise reviewer from adding months to your approval.